TM 9-4931-355-14
quality assurance/quality control time in addition to the
e. Column 5, Tools and Equipment. Column 5
time required to perform the specific tasks identified for
specifies by code, those common tool sets and special
the maintenance functions authorized in the
tools, test, and support equipment required to perform
maintenance allocation chart.
the designated function.
Section II. MAINTENANCE ALLOCATION CHART
(1)
(2)
(3)
(4)
(5)
Maintenance
Category*
Group
Component/
Maintenance
Tools and
Number
Assembly
Function
C
O
F
H
D
Equipment
Kit, Alinement
Inspect
0.1
Service
0.2
Replace
0.1
Repair
0.2
Inspect
0.1
Test
0.3
Service
0.1
Replace
0.1
Repair
1.0
1
Cables
Inspect
0.1
Test
0.5
Service
0.2
Replace
0.1
Repair
10.
1
Cases, Carrying
Inspect
0.1
Replace
0.1
Repair
1.0
Extender Cards
Inspect
0.1
Test
0.3
Service
0.1
Replace
0.1
Repair
0.5
1
Handle Assembly, Ballistic Cover
Inspect
0.1
Replace
0.1
Handle R/T
Inspect
0.1
Replace
0.1
Adapter, Tester
Inspect
0.1
Service
0.1
Replace
0.1
Repair
0.1
1
Tester, R/T
Inspect
0.1
Test
0.5
Service
0.5
Calibrate
1.0
Replace
0.1
Repair
1.0
Overhaul
5.0
1,2,3
Tie Rod Assembly, Handle R/T
Inspect
0.1
Replace
0.1
Tool, Removal-Boot
Inspect
0.1
Replace
0.1
Eyebolts
Inspect
0.1
Replace
0.1
Holding Fixture
Inspect
0.1
Replace
0.1
Puller, Circuit Card
Inspect
0.1
Replace
0.1
Gage, Depth
Inspect
0.1
Replace
0.1
C-2