TM 5-6675-348-13&P
(74) Cable tie Mast Cable (94) to the tab (93) on
bottom of plate (91).
(75) Route Mast Cable (94) around inside lower
edge of Stowage Box (92).
(76) Remove dust plug (96) from left rear side of
Stowage Box (92).
NOTE
Cut cross-cut slit large enough to allow
Mast Cable to be routed through dust plug.
(77) Cut cross-cut slit in center of dust
plug (96).
(78) Route Mast Cable (94) through dust
plug (96) hole.
(79) Install dust plug (96) with Mast Cable (94)
in left rear side of Stowage Box (92).
(80) Route Arm Sensor Cable (5) and
Encoder Cable (42) alongside left-hand
Bucket Cylinder Hydraulic Hose (97)
to base of Boom (12).
(81) Secure Arm Sensor Cable (5) and
Encoder Cable (42) to Bucket Cylinder
Hydraulic Hose (97) with tie wraps
every 6 to 8 in. (15.2 to 20.3 cm).
(82) Route Mast Cable (94) to join Arm
Sensor Cable (5) and Encoder
Cable (42) at base of Boom (12).
(83) From end of cables, measure
approximately 6 ft (1.9 m) of Arm
Sensor Cable (5), Boom Sensor
Cable (25), and Encoder Cable (42)
Loop cables from 6 ft (1.9 m) mark to
base of Boom (12) to create a service
loop.
4-57