TM 11-5860-200-12
b.
Install the static pressure line forward bottom clamp, and clamp holding pitot tube heater wires.
c.
Connect forward pylon fairing assembly (1) (refer to TM 55-1520-236-20 or TM 55-1520-239-23-1).
Figure 3-12. Receiver and Electronics Assembly Access Locations.
3-19